Sludge Digester Improvements
Closed · New Jersey · Last reported May 2023
Source: Dodge USA
he project consists of two prime contracts: 1. Contract 1 General. 2. Contract 2 Electrical. The work of this project includes providing new material, equipment, and labor for process improvements to the sludge digestion system as described in the Project Manual. The scope of work includes the demolition of existing process air system components and installing two new blowers, process air piping s
- Status
- Closed
- Sector
- Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage
- Location
- Livingston, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Sludge Digester Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he project consists of two prime contracts: 1. Contract 1 General. 2. Contract 2 Electrical. The work of this project includes providing new material, equipment, and labor for process improvements to the sludge digestion system as described in the Project Manual. The scope of work includes the demolition of existing process air system components and installing two new blowers, process air piping system and support, replacement of three buried sludge valves, electrical, controls and other misc... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Livingston |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Waste Processing and Treatment, Government, Commercial, Water Supply and Storage |
Article published date | 2023-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
