Sludge Thickeners No 1 and No 2 Rehabilitation
Sector: Power Generation (CCGT) • Location: Madison, Wisconsin, United States of America
Source: Dodge USA
The Sludge Thickeners No. 1 And No 2. Rehabilitation Project involves the removal and replacement of gravity thickening equipment located in the respective tanks. Major equipment removal and replacement consists of motor drives, walkways, rake arms and piping. Project also includes disconnecting existing electrical feeds to the motor drive and reconnection to the new motor drives.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Sludge Thickeners No. 1 And No 2. Rehabilitation Project involves the removal and replacement of gravity thickening equipment located in the respective tanks. Major equipment removal and replacement consists of motor drives, walkways, rake arms and piping. Project also includes disconnecting existing electrical feeds to the motor drive and reconnection to the new motor drives. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
