SM2PCL
Sector: Power Generation (CCGT) • Location: Bangladesh
Source: IFC Project Disclosures
The Project is expected to be commissioned by January 2021. The sole offtaker for the Project will be Bangladesh Power Development Board (“BPDB”). General Electric (“GE”) will be the Engineering, Procurement and Construction (“EPC”) contractor for the Project.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Geothermal
- Location
- Bangladesh
- Updated
- 19 Nov 2026
- Source
- IFC Project Disclosures
ConstructChat
Ask ConstructChat about SM2PCL
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project is expected to be commissioned by January 2021. The sole offtaker for the Project will be Bangladesh Power Development Board (“BPDB”). General Electric (“GE”) will be the Engineering, Procurement and Construction (“EPC”) contractor for the Project. |
Original sector | V-AE - Multi Fuel - Thermal Power Generation |
Location
Country | Bangladesh |
Source
Source | IFC Project Disclosures |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Geothermal |
Article published date | 2026-09-09 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
