logo

Smackover Lithium Joint Venture

Sector: Mining • Location: Texas, United States

Source: Stock Titan

Project
Planned

The Smackover Lithium Joint Venture with Equinor is expanding its mineral leasing program in East Texas, covering 185,000 acres. The first project area spans approximately 67,000 acres in Franklin County, where high lithium brine grades have been discovered.

Status
Prospective
Sector
Mining
Location
Texas, United States of America
Updated
22 Jul 2026
Source
Stock Titan

ConstructChat

Ask ConstructChat about Smackover Lithium Joint Venture

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Smackover Lithium Joint Venture” is an infrastructure initiative in the Mining sector, located in Texas, United States. Taiyo aggregates data on it from Stock Titan.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Smackover Lithium Joint Venture with Equinor is expanding its mineral leasing program in East Texas, covering 185,000 acres. The first project area spans approximately 67,000 acres in Franklin County, where high lithium brine grades have been discovered.

Original sector

Mining

Location

Country

United States of America (USA)

State

Texas

Source

Source

Stock Titan

URL

More Details

Record type

Project

Article published date

2025-04-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project