Small Bridge Replacement - Gallant Brook No.1
One of 10,000+ projects Taiyo tracks in New Brunswick.
Source: Infrastructure Canada
The project consists of replacing a steel stringer bridge structure with twin 2400 x 2400 mm concrete box culverts. A temporary on-site detour with a 30m long modular bridge will be put in place on the west side of the structure for the duration of the project. Sheet piling and sandbags will be used for temporary water control. The project will benefit the rural community of Shediac Bridge.
- Status
- Closed
- Sector
- Water Supply and Storage, Steel, Cement, Bridge, Road
- Location
- New Brunswick, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Small Bridge Replacement - Gallant Brook No.1
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of replacing a steel stringer bridge structure with twin 2400 x 2400 mm concrete box culverts. A temporary on-site detour with a 30m long modular bridge will be put in place on the west side of the structure for the duration of the project. Sheet piling and sandbags will be used for temporary water control. The project will benefit the rural community of Shediac Bridge. |
Original sector | Roads, Bridges and Trade Infrastructure |
Location
Country | Canada |
State | New Brunswick |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Steel, Cement, Bridge, Road |
Article published date | 2026-03-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
