Small Facilities Improvements
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The work on campus is to include widening a door frame in one building and installing a new cementitious urethane flooring system in another building s bathroom. The door frame widening is needed so that 50" beds could pass through. With the bathroom floor remodeling project, the plumbing fixtures need to be removed and once the floor is installed, the fixtures need to be reinstalled back.
- Status
- Closed
- Sector
- Commercial, Hotel, Hospital
- Location
- Hartford, Vermont, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Small Facilities Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work on campus is to include widening a door frame in one building and installing a new cementitious urethane flooring system in another building s bathroom. The door frame widening is needed so that 50" beds could pass through. With the bathroom floor remodeling project, the plumbing fixtures need to be removed and once the floor is installed, the fixtures need to be reinstalled back. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Vermont |
City | Hartford |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Hotel, Hospital |
Article published date | 2024-04-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
