logo
ProjectForthcoming

Smart and PROgrammable Substation Ecosystems for Resilient Distribution GRIDs

Sector: Education • Location: Ireland, Albania, Bosnia and Herzegovina, France, Greece, United Kingdom, Germany, Italy, Kosovo *, North Macedonia, Montenegro, Türkiye, Serbia

Source: EU Funding & Tenders Portal

"GRID-PRO addresses the critical bottleneck of the energy transition by transforming distribution substations from passive assets into programmable, intelligent cyber-physical hubs. The project brings together a 24-partner consortium, including 7 DSOs and 5 TSOs, technology providers and research organisations across Europe, to achieve 9 SMART objectives, driving a maturation pathway to TRL8 acros

Status
Prospective
Sector
Education, Power Generation (CCGT)
Location
Ireland, Albania, Bosnia and Herzegovina, France, Greece, United Kingdom, Germany, Italy, Kosovo *, North Macedonia, Montenegro, Türkiye, Serbia
Updated
19 Nov 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Smart and PROgrammable Substation Ecosystems for Resilient Distribution GRIDs

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Smart and PROgrammable Substation Ecosystems for Resilient Distribution GRIDs” is an infrastructure initiative in the Education sector, located in Ireland, Albania, Bosnia and Herzegovina, France, Greece, United Kingdom, Germany, Italy, Kosovo *, North Macedonia, Montenegro, Türkiye, Serbia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

forthcoming

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

"GRID-PRO addresses the critical bottleneck of the energy transition by transforming distribution substations from passive assets into programmable, intelligent cyber-physical hubs. The project brings together a 24-partner consortium, including 7 DSOs and 5 TSOs, technology providers and research organisations across Europe, to achieve 9 SMART objectives, driving a maturation pathway to TRL8 across four complementary demonstration environments. The project will demonstrate enhanced real-time grid observability, controllability, flexibility and resilience, enabling the safe integration of high shares of Distributed Energy Resources through the following pilots: 1. Italian Pilot: Hybrid AC/DC Smart Substation for LV Grid Resilience. 2. German Pilot: Breaking data silos for computable grids using Digital Twin. 3. Greek Pilot: Market-aware dynamic constraint management for BESS integration. 4. South-East Europe Cluster (9 Pilots): Vendor-agnostic Digital Twin Platform, TSO-DSO coordination and AI-driven grid resilience. At the core of the project lies the Smart Substation Ecosystem (SSE), which is based on an innovative, vendor-agnostic Digital Twin Platform, starting at TRL 7 and acting as the operational ""brain."" Furthermore, enhanced by the integration of SCADA, OT, GIS, ERP, and market data, the SSE establishes a 'Single-Source-of-Truth' consistent with the SGAM-approach, transforming fragmented silos into real-time intelligence for automated control and grid-forming resilience. GRID-PRO advances the state-of-the-art through 10 Innovation Actions (IA), covering Deep Observability and Control, AI-Driven Logic, Cyber-Resilience and Hybrid, Market-aware Infrastructures, that will culminate in a comprehensive European Integration Blueprint and replication toolkit for the programmable, digital, Smart Substation Ecosystem, addressing also non-technical barriers to ensure the project’s innovations are ready for large-scale deployment across European power systems."

Location

Country

Ireland, Albania, Bosnia and Herzegovina, France, Greece, United Kingdom, Germany, Italy, Kosovo *, North Macedonia, Montenegro, Türkiye, Serbia

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Education, Power Generation (CCGT)

Article published date

2026-10-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project