logo

Smart, Aware, Integrated Wind Farm Control Interacting with Digital Twins (ICONIC)

Sector: Wind • Location: Belgium, Norway, Denmark, Spain, Netherlands

Source: EU Funding & Tenders Portal

Project
Ongoing

ICONIC aims to develop innovative physical and digital tools to achieve fundamental breakthroughs for the integrated control of wind farms, considering the whole physical system at farm, turbine, and component levels, in particular the complex aerodynamic interactions among turbines. ICONIC aims to increase farm-wide power production by 15-20% under optimal wind speeds and directions for typical w

Status
Under Construction
Sector
Wind, Tunnel, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial), Government
Location
Belgium
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about Smart, Aware, Integrated Wind Farm Control Interacting with Digital Twins (ICONIC)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Smart, Aware, Integrated Wind Farm Control Interacting with Digital Twins (ICONIC)” is an infrastructure initiative in the Wind sector, located in Belgium, Norway, Denmark, Spain, Netherlands. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Sponsoring Agency

Status

Original status

ongoing

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

ICONIC aims to develop innovative physical and digital tools to achieve fundamental breakthroughs for the integrated control of wind farms, considering the whole physical system at farm, turbine, and component levels, in particular the complex aerodynamic interactions among turbines. ICONIC aims to increase farm-wide power production by 15-20% under optimal wind speeds and directions for typical wind farms suffering from wake effects, with a 3%-5% increase in annual energy production (AEP) considering all working conditions over the long term. It targets an LCOE reduction of at least 6% compared with the state-of-the-art control tools deployed in the current wind industry by improving farm-wide AEP and reducing operation & maintenance costs via leveraging the latest AI and digital technologies. Extensive validations for the integrated wind farm control solutions will be conducted via high-fidelity simulation models, experiments at a national-level wind tunnel, historical operational data at BP’s and C-Power’s wind farms, a unique collection of test rigs for critical turbine components at respective companies, and real-world wind farm field tests at C-Power. ICONIC’s integrated wind farm control system will contain (1) novel AI-based wind farm control system to unlock wind farms’ full potential; (2) novel data-enhanced wind turbine controllers to fulfil farm-level commands while balancing power generation and load mitigation; (3) an integration with digital twins (DTs) as extra support to improve control and reduce costs, which contains a first-ever farm-level DT for wind farm flow systems replicating detailed physical flow fields and an innovative turbine-level DT with critical component models for loading and lifetime estimations; (4) extensions of the solutions to future 20MW turbines. ICONIC will establish new knowledge and industrial leadership in key digital, enabling and emerging technologies, and deliver next-generation tools for wind farm operation.

Location

Country

Belgium

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Wind, Tunnel, Raw Materials, Power Generation (CCGT), Manufacturing (Industrial), Government

Article published date

2025-12-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project