logo

SmArt BI-directional multi eNergy gAteway

Sector: Power Generation (CCGT) • Location: United Kingdom, Switzerland, Spain, Denmark, Greece, Belgium, Czechia

Source: EU Funding & Tenders Portal

Project
Ended

Flexibility needs to be added to Europe’s power system to accommodate an increasing share of variable power generation from renewable sources. Indeed, service quality issues start to arise on the grid when this share in electricity consumption reaches 10%. To meet the EU’s targets for reduction of greenhouse gas emissions this share should rise to 30% by 2030 and up to 50% by 2050. The cost of thi

Status
Closed
Sector
Power Generation (CCGT), Geothermal, Education, Commercial
Location
United Kingdom, Switzerland, Spain, Denmark, Greece, Belgium, Czechia
Updated
22 Jul 2026
Source
EU Funding & Tenders Portal

ConstructChat

Ask ConstructChat about SmArt BI-directional multi eNergy gAteway

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “SmArt BI-directional multi eNergy gAteway” is an infrastructure initiative in the Power Generation (CCGT) sector, located in United Kingdom, Switzerland, Spain, Denmark, Greece, Belgium, Czechia. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Participants

Not available for this record.

Status

Original status

ended

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Flexibility needs to be added to Europe’s power system to accommodate an increasing share of variable power generation from renewable sources. Indeed, service quality issues start to arise on the grid when this share in electricity consumption reaches 10%. To meet the EU’s targets for reduction of greenhouse gas emissions this share should rise to 30% by 2030 and up to 50% by 2050. The cost of this transition and the necessary measures to guarantee stable and continuous supply are a major political concern. The SABINA project responds to it by targeting the cheapest possible source of flexibility: the existing thermal inertia in buildings and the coupling between heat and electricity networks it enables. This coupling requires accurately estimating the thermal inertia of many buildings. SABINA’s partner the University of Navarra has created a breakthrough, automatic method for this estimation, which shall be scaled up, validated and integrated in a complete management system through this project. This system will operate on two complementary time horizons: • One day: aggregation and management at the district level of the electric and thermal flexibilities, and conversion and storage of the excess electrical energy to thermal energy in the freely available building inertia. • Seconds to minutes: local control of inverters feeding renewable electricity to the grid, with optimal parameters automatically determined at the district level. Research partners will develop novel control and optimization algorithms, and integrate and evaluate the system in lab and operational settings. The SABINA solution is compatible with both new and existing buildings; it is planned to be deployed within five years of the end of the project. Lead users are present in the consortium: Telvent and SMS plc, the coordinator, for the architecture, and Insero for the business model it enables; compliance and contribution to relevant standards will be ensured by the European Digital SME Alliance

Location

Country

United Kingdom, Switzerland, Spain, Denmark, Greece, Belgium, Czechia

Source

Source

EU Funding & Tenders Portal

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Geothermal, Education, Commercial

Article published date

2026-01-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project