Smart Manufacturing Campus / XDGA
Closed · Last reported Feb 2025
Source: ArchDaily
The project is conceived as a fully modular, flexible building in which the units of independent companies can be (re)arranged, expanded or reduced.Text description provided by the architects.The Smart Manufacturing Campus houses companies and institutions working in the field of smart technology.On the upper level, the offices are housed around patios that not only create outdoor -or indoor- spac
- Status
- Closed
- Sector
- Steel, Manufacturing (Industrial), Automotive, Road, Residential, Commercial
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Smart Manufacturing Campus / XDGA
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is conceived as a fully modular, flexible building in which the units of independent companies can be (re)arranged, expanded or reduced.Text description provided by the architects.The Smart Manufacturing Campus houses companies and institutions working in the field of smart technology.On the upper level, the offices are housed around patios that not only create outdoor -or indoor- spaces for the staff, yet allow light to enter the deep interiors of the underlying workshops.On the ground floor of the building are located all the production and storage spaces, easily reachable by heavy machinery and vehicles through a column-free inner street. |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Steel, Manufacturing (Industrial), Automotive, Road, Residential, Commercial |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- Fire Lake Mining
- Kearl Ore Preparation Plant
