logo

SMART MONITORING SYSTEM BASED ON A REAL-TIME TRACKING OF OVERHEAD TRANSMISSION LINE STATE

Sector: Power Generation (CCGT) • Location: Spain

Source: EU Funding & Tenders Portal

Project
Ended

The main objective of this Phase I is to perform a thorough feasibility study to verify the practical and economic viability of an innovative and inexpensive system for reliable real time monitorisation of the ampacity (the instantaneous current carrying capacity of an overhead power transmission line) in the high-voltage European Transmission System Operators market. Based on the propagation tim

Project Information FAQ

Project Information

3 Q
The project “SMART MONITORING SYSTEM BASED ON A REAL-TIME TRACKING OF OVERHEAD TRANSMISSION LINE STATE” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Spain. Taiyo aggregates data on it from EU Funding & Tenders Portal.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

ended

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The main objective of this Phase I is to perform a thorough feasibility study to verify the practical and economic viability of an innovative and inexpensive system for reliable real time monitorisation of the ampacity (the instantaneous current carrying capacity of an overhead power transmission line) in the high-voltage European Transmission System Operators market. Based on the propagation time of ultrasonic frequency acoustic waves, the system determines the length of the cable, which consequently provides the average temperature of the conductor and permits the dynamic calculation of the average transmission capacity of overhead lines in real-time, thus allowing a potential increase of 20-25% of the load capacity (in average) with respect to static seasonal ratings and an overall improvement of the management of the transmission and distribution network. RELOGABLE will define in this Phase I its marketing and communication strategies. The actual market chances will be analysed and a more detailed business plan will be developed in order to have the technology ready for commercialisation with appropriate licensing and other business arrangements concluded. The work carried out in Phase I will allow RELOGABLE to objectively and rationally uncover the strengths and weaknesses of the SMS-OHTL project, including potential design modifications to adapt the system to an industrial environment and the study of scalability and implementation of the industrial production process, identifying the existing opportunities present in the environment and establishing the proper measures to mitigate the effect of potential threats and barriers. These studies will allow RELOGABLE to diversify its business and access a new market with high innovation potential reaching a turnover of €10 million by 2021 and create at least 70 direct jobs in that period.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data