Smart Water Meters Upgrade
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Upgrade the City s existing automatic meter reading (AMR) portable radio-based water system with an advanced metering infrastructure (AMI) fixed-based system. The project will upgrade every water meter within the City s service area to simplify billing and leak detections. Maintenance crew and billing staff will be able to view data in real-time and assist residents as needed. Budgeting for this p
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Tukwila, Washington, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Smart Water Meters Upgrade
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Upgrade the City s existing automatic meter reading (AMR) portable radio-based water system with an advanced metering infrastructure (AMI) fixed-based system. The project will upgrade every water meter within the City s service area to simplify billing and leak detections. Maintenance crew and billing staff will be able to view data in real-time and assist residents as needed. Budgeting for this project included the need for a grant. Once received, a design and construction timeline will be u... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Tukwila |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-12-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
