SMCC EV Charging Stations
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
to install, operate, and maintain three to five Level 2 or DC Fast EV charging stations on campus under a fully funded model. The selected vendor will bear all costs associated with equipment, installation, and ongoing operations, in exchange for retaining revenue generated from charging services. - req doc from owner for the scope
- Status
- Closed
- Sector
- Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial
- Location
- South Portland, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about SMCC EV Charging Stations
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | to install, operate, and maintain three to five Level 2 or DC Fast EV charging stations on campus under a fully funded model. The selected vendor will bear all costs associated with equipment, installation, and ongoing operations, in exchange for retaining revenue generated from charging services. - req doc from owner for the scope |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | South Portland |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Power Generation (CCGT), Automotive, Manufacturing (Industrial), Commercial |
Article published date | 2025-09-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
