Smith County Bridge Rehabilitation II
Sector: Road • Location: Tyler, Texas, United States
Source: KLTV
The project consists of cleaning and sealing existing joints, resurfacing the bridge deck, steel and concrete repairs. Crews are performing bridge maintenance and installation of materials with nightly lane closures on I-20 at Saline Creek.
- Status
- Under Construction
- Sector
- Road, Cement, Bridge, Steel, Metal, Government
- Location
- Tyler, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- KLTV
ConstructChat
Ask ConstructChat about Smith County Bridge Rehabilitation II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project consists of cleaning and sealing existing joints, resurfacing the bridge deck, steel and concrete repairs. Crews are performing bridge maintenance and installation of materials with nightly lane closures on I-20 at Saline Creek. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Tyler |
Source
Source | KLTV |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Bridge, Steel, Metal, Government |
Article published date | 2025-12-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
