logo
ProjectPlanning Schematics

Smith Switch Road shared-use path

One of 10,000+ projects Taiyo tracks in Virginia.

Source: Dodge

This project provides for the design, right-of-way acquisition, and construction of 0.63 miles of shared-use paths along the east side of Smith Switch Road from Gloucester Parkway to an existing asphalt path north of Chilum Place. This includes a crossing/connection to a realigned W&OD trail crossing at Smith Switch Road (designed under a separate project). The project is ranked as priority #15 in

Status
Prospective
Sector
Government, Commercial, Power Transmission, Car parking, Power Generation (CCGT), Automotive, Road
Location
Ashburn, Virginia, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Smith Switch Road shared-use path

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Smith Switch Road shared-use path” is an infrastructure initiative in the Government sector, located in Ashburn, Virginia, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Planning Schematics

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project provides for the design, right-of-way acquisition, and construction of 0.63 miles of shared-use paths along the east side of Smith Switch Road from Gloucester Parkway to an existing asphalt path north of Chilum Place. This includes a crossing/connection to a realigned W&OD trail crossing at Smith Switch Road (designed under a separate project). The project is ranked as priority #15 in the Sidewalks and Trails Program. Loudoun County Division of Procurement may be seeking a Consul...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Virginia

City

Ashburn

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Commercial, Power Transmission, Car parking, Power Generation (CCGT), Automotive, Road

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project