Smith Valley Road Reconstruction
Pre-design · Indiana · Last reported Feb 2025
Source: Dodge
Reconstructing and widening Smith Valley Road from Browning Drive to about 345 feet west of U.S. 31. Project includes two through-lanes in each direction, a two-way left turn lane or raised center median, curbs and gutters, new storm sewer, multi-use paths, and a mid-block pedestrian crossing.
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road
- Location
- Greenwood, Indiana, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Smith Valley Road Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Pre-Design |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Reconstructing and widening Smith Valley Road from Browning Drive to about 345 feet west of U.S. 31. Project includes two through-lanes in each direction, a two-way left turn lane or raised center median, curbs and gutters, new storm sewer, multi-use paths, and a mid-block pedestrian crossing. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Indiana |
City | Greenwood |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment, Road |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
