Smithville Loop 230 Regional Pond & Drainage Improvements
Sector: Water Supply and Storage • Location: Smithville, Texas, United States of America
Source: Dodge USA
I. Demolition of existing building and trees 2. Pond Excavation (55,000 CY) 3. Pond Storm water Pump Station & Force Main 4. Storm inlets and junction box (9 total) and storm sewer (1,350 LF) 5. Chain link Fencing (1,950 LF) 6. Miscellaneous reinforced concrete pavement, asphalt pavement repair, and utility adjustments 7. Re-vegetation
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Commercial, Raw Materials, Government, Consumer Products, Road, Cement, Power Generation (CCGT)
- Location
- Smithville, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Smithville Loop 230 Regional Pond & Drainage Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | I. Demolition of existing building and trees 2. Pond Excavation (55,000 CY) 3. Pond Storm water Pump Station & Force Main 4. Storm inlets and junction box (9 total) and storm sewer (1,350 LF) 5. Chain link Fencing (1,950 LF) 6. Miscellaneous reinforced concrete pavement, asphalt pavement repair, and utility adjustments 7. Re-vegetation |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Smithville |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Power Transmission, Commercial, Raw Materials, Government, Consumer Products, Road, Cement, Power Generation (CCGT) |
Article published date | 2024-10-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
