SMP-ESS-2022-ILC-SILC-IBA — Income and living conditions domain - SILC statistical infrastructure under IESS - SILC 2024 6-yearly variables on Access to services - Pilot study 2023 Infra-annual data c
One of 2,037 projects Taiyo tracks in Croatia.
Source: EU Funding & Tenders Portal
Following changes such as improved timeliness, shorter deadlines for EU-SILC data transmission, improved precision, with introduction of additional/changed variables and variables of 3-yearly and 6-yearly modules, brought by new legal acts, there are needs for enhancing in the EU-SILC data preparation, collection methods, processing, transmission and reporting. This project will include fundable a
- Status
- Closed
- Sector
- Government
- Location
- Croatia
- Updated
- 22 Jul 2026
- Source
- EU Funding & Tenders Portal
ConstructChat
Ask ConstructChat about SMP-ESS-2022-ILC-SILC-IBA — Income and living conditions domain - SILC statistical infrastructure under IESS - SILC 2024 6-yearly variables on Access to services - Pilot study 2023 Infra-annual data c
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | ended |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Following changes such as improved timeliness, shorter deadlines for EU-SILC data transmission, improved precision, with introduction of additional/changed variables and variables of 3-yearly and 6-yearly modules, brought by new legal acts, there are needs for enhancing in the EU-SILC data preparation, collection methods, processing, transmission and reporting. This project will include fundable activities from Call: SMP-ESS-2022-ILC-SILC-IBA which refers on EU-SILC 2024 data preparation, data collection (combining fieldwork and administrative data), data processing and dissemination of microdata with activity of preparation and testing of variables for EU-SILC 2025 module ‘Energy and environment’. As in project are included all activities needed for perform an operation year (in this case EU-SILC 2024 operation year), project is divided in two Work packages which are explained in chapter 4. Project also includes introduction of the 6-yearly module ‘Access to services’, which will be included in EU-SILC 2024 Blaise questionnaire for the first time. Due to the introduction of the 6-yearly module, there is a need for subcontracting of external interviewers. As EU-SILC 2022 operation year is last year with granted derogation for data transmission, reaching the required changes and deadlines from 2023 operation year onwards will be challenging. Purpose of this project will be to perform and optimize all needed activities for conducting 2024 EU-SILC operation with required changes adopted by new legal acts – Regulation (EU) 2019/1700 and its implementing and delegated acts. |
Location
Country | Croatia |
Source
Source | EU Funding & Tenders Portal |
URL |
More Details
Record type | Project |
Sector | Government |
Article published date | 2026-02-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
