logo

Smyrna Wastewater Treatment Plant Upgrade and Expansion

Sector: Commercial • Location: United States of America (USA)

Source: ENR News

Project
Open For Bidding

Tennessee The Town of Smyrna has awarded a $27.5-million contract to Judy Construction Co. to upgrade and expand its wastewater treatment plant. The expansion will increase the capacity from 5.85 mgd to 9.0 mgd. The expansion will consist of upgrading the existing headworks with new screens, upgrading the existing raw water pump station with new larger pumps, constructing a new anaerobic basin wit

Project Information FAQ

Project Information

5 Q
The project “Smyrna Wastewater Treatment Plant Upgrade and Expansion” is an infrastructure initiative in the Commercial sector, located in United States of America (USA). Taiyo aggregates data on it from ENR News.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

open for bidding

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Tennessee The Town of Smyrna has awarded a $27.5-million contract to Judy Construction Co. to upgrade and expand its wastewater treatment plant. The expansion will increase the capacity from 5.85 mgd to 9.0 mgd. The expansion will consist of upgrading the existing headworks with new screens, upgrading the existing raw water pump station with new larger pumps, constructing a new anaerobic basin with a flow splitter box, retrofitting the six existing oxidation basins, constructing a new oxidation basin, constructing a new clarifier splitter box, constructing two new clarifiers, constructing a new tertiary filter structure, upgrading the existing ultraviolet light disinfection facility, removing an in-line filter and installing a third reuse water pump in the reuse water pumping station, installing a rotary drum sludge thickener and digester decanter at the digester building, removing the existing belt presses and installing two new centrifuges at the dewatering building.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data