sniwt iʔ k̓ʷul̓mntn Wind Project
Sector: Wind • Location: British Columbia, Canada
Source: BC Gov News
A 94-megawatt wind farm majority owned by the Upper Nicola Band and developed in partnership with Elemental Energy, located between Merritt and Kelowna, targeting construction start in spring 2027, producing enough clean electricity to power approximately 25,000 homes annually.
- Status
- Prospective
- Sector
- Wind, Power Generation (CCGT), Raw Materials
- Location
- British Columbia, Canada
- Updated
- 22 Jul 2026
- Source
- BC Gov News
ConstructChat
Ask ConstructChat about sniwt iʔ k̓ʷul̓mntn Wind Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A 94-megawatt wind farm majority owned by the Upper Nicola Band and developed in partnership with Elemental Energy, located between Merritt and Kelowna, targeting construction start in spring 2027, producing enough clean electricity to power approximately 25,000 homes annually. |
Original sector | Energy |
Location
Country | Canada |
State | British Columbia |
Source
Source | BC Gov News |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT), Raw Materials |
Article published date | 2026-05-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project