logo

Snow Water Supply Forecasting Program

Sector: Commercial • Location: United States of America

Source: Grants.gov

Project
Closed

The United States Department of the Interior (Department), Bureau of Reclamation’s (Reclamation) Snow Water Supply Forecasting Program (Program) aims to improve the skill of water supply forecasts via enhancing snow monitoring through the deployment of emerging technologies to complement existing monitoring techniques and networks. This new program was authorized in December 2020 by P.L. 116-260,

Project Information FAQ

Project Information

4 Q
The project “Snow Water Supply Forecasting Program” is an infrastructure initiative in the Commercial sector, located in United States of America. Taiyo aggregates data on it from Grants.gov.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The United States Department of the Interior (Department), Bureau of Reclamation’s (Reclamation) Snow Water Supply Forecasting Program (Program) aims to improve the skill of water supply forecasts via enhancing snow monitoring through the deployment of emerging technologies to complement existing monitoring techniques and networks. This new program was authorized in December 2020 by P.L. 116-260, Sec. 1111, Snow Water Supply Forecasting Program Authorization Act. The program was authorized for FY 2022 - FY 2026.  Reservoir operations and related water management decisions rely on estimates of current and future water availability. These estimates depend on technologies to observe basin conditions such as snowpack. In many Western basins, snowpack and subsequent snow melt runoff constitutes a significant portion of the annual water supply. Accordingly, monitoring snowpack is of great interest to water managers and water users alike. Traditionally, basin snowpack information is based on a sparse network of observing stations across large watersheds. These networks provide high quality information at station locations but extrapolating that information to an entire watershed is a challenge. This challenge, in large part, motivates the Program.   As such, the NOFO invites proposals from eligible applicants that are invested in and capable of demonstrating emerging or deploying existing snow monitoring technologies and/or use of snow monitoring data to enhance water supply forecast skill. Considering this and the Act’s emphasis on partner agency coordination, strong applications will have partnerships with water management and forecasting entities to facilitate transfer of knowledge, foster use of data in forecasts, and evaluate utility of information for informing water management decisions. This supports Department of the Interior priority of addressing the drought crisis by providing water managers the best available information to inform the management of this scarce and critical resource. In Phase I, applicants submit technical proposals in the required format and length as specified in Section D.2.1. Application Format and Length as well as with the required content further detailed in Section D.2.2. Application Content. Submission to Phase I is required for Phase II consideration. Reclamation’s application review committee (ARC) will select a set of highly qualified applications from Phase I to move to Phase II of the application process. Submission to Phase I is required for Phase II consideration. If the selected applicants are not present for Phase II, their proposals are automatically disqualified from proceeding further and will be ineligible for an award. Phase II will entail a 30-minute virtual (web meeting) project/proposal “pitch” presentation to a review panel, followed by 20 minutes of question and answer with the review panel. Those selected to advance to Phase II will be notified of the presentation requirements and logistics with a minimum 4 week's notice.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data