Snowmaking Pipe Replacement - CH
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Full replacement of approx. 1040m of snowmaking pipe 520m water distribution and 520m of compressed air, adding roughly 160m of new pipe install (80m water, 80m compressed air). The installation and welding of 2-inch FNPT nipples for hydrants at 34 designated locations along the pipelines.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment
- Location
- Milton, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Snowmaking Pipe Replacement - CH
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Full replacement of approx. 1040m of snowmaking pipe 520m water distribution and 520m of compressed air, adding roughly 160m of new pipe install (80m water, 80m compressed air). The installation and welding of 2-inch FNPT nipples for hydrants at 34 designated locations along the pipelines. |
Procurement method | |
Budget |
Location
Country | Canada |
State | Ontario |
City | Milton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Commercial, Waste Processing and Treatment |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
