Snows Cut Bank Stabilization SOURCES SOUGHT
One of 10,000+ projects Taiyo tracks in North Carolina.
Source: Dodge USA
The work shall consist of stabilization of approximately 2200 feet of shoreline along two distinct areas on the north bank of Snows Cut, between the US Highway 421 bridge and the Cape Fear River. Bank stabilization would involve vegetation clearing, sloping of bank and the placement of riprap and other erosion protection measures along the bank.
- Status
- Prospective
- Sector
- Commercial, Bridge, Consumer Products, Road
- Location
- Wilmington, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Snows Cut Bank Stabilization SOURCES SOUGHT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | pre-design |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall consist of stabilization of approximately 2200 feet of shoreline along two distinct areas on the north bank of Snows Cut, between the US Highway 421 bridge and the Cape Fear River. Bank stabilization would involve vegetation clearing, sloping of bank and the placement of riprap and other erosion protection measures along the bank. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Wilmington |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Bridge, Consumer Products, Road |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
