logo

Snowy 2.0 Energy Storage Project

Sector: Hydro • Location: New South Wales, Australia

Source: The Guardian

Project
Under Construction

The Snowy 2.0 project involves the construction of long-duration energy storage systems, including a 15-hour pumped hydro project and two 8-hour battery systems. These projects aim to enhance energy storage capacity and reliability in New South Wales, creating jobs and supporting the transition to renewable energy.

Status
Under Construction
Sector
Hydro, Energy Storage
Location
New South Wales, Australia
Updated
22 Jul 2026
Source
The Guardian

ConstructChat

Ask ConstructChat about Snowy 2.0 Energy Storage Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Snowy 2.0 Energy Storage Project” is an infrastructure initiative in the Hydro sector, located in New South Wales, Australia. Taiyo aggregates data on it from The Guardian.

Participants

Not available for this record.

Status

Original status

Under Construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Snowy 2.0 project involves the construction of long-duration energy storage systems, including a 15-hour pumped hydro project and two 8-hour battery systems. These projects aim to enhance energy storage capacity and reliability in New South Wales, creating jobs and supporting the transition to renewable energy.

Original sector

Energy

Location

Country

Australia

State

New South Wales

Source

Source

The Guardian

URL

More Details

Record type

Project

Sector

Hydro, Energy Storage

Article published date

2025-03-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project