logo
ProjectClosed

Snowy 2.0 Feasibility Study

Sector: Commercial • Location: Australia

Source: Australian Renewable Energy Agency (ARENA)

The Snowy 2.0 feasibility study confirms that the Snowy 2.0 pumped hydro expansion project is both technically and financially feasible.Snowy 2.0 would deliver 2000 MW of additional dispatchable generation capacity and 350,000 MWh of storage. The construction would involve building an underground hydro-electric power station and 27 kilometres of tunnels connecting two existing reservoirs in the Sn

Status
Closed
Sector
Commercial, Energy Storage, Hydro, Power Generation (CCGT), Solar, Stadium, Tunnel, Wind, Water Supply and Storage, Government, Consumer Products, Raw Materials, Manufacturing (Industrial)
Location
Australia
Updated
22 Jul 2026
Source
Australian Renewable Energy Agency (ARENA)

ConstructChat

Ask ConstructChat about Snowy 2.0 Feasibility Study

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Snowy 2.0 Feasibility Study” is an infrastructure initiative in the Commercial sector, located in Australia. Taiyo aggregates data on it from Australian Renewable Energy Agency (ARENA).

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Snowy 2.0 feasibility study confirms that the Snowy 2.0 pumped hydro expansion project is both technically and financially feasible.Snowy 2.0 would deliver 2000 MW of additional dispatchable generation capacity and 350,000 MWh of storage. The construction would involve building an underground hydro-electric power station and 27 kilometres of tunnels connecting two existing reservoirs in the Snowy Mountains.Snowy Hydro already plays a critical role in ensuring system stability and at times of peak demand, the ability to keep the lights on. The feasibility study shows how Snowy 2.0 will enhance this current capability and continue to provide increased stability and security to the energy market.Area of innovationThe Snowy 2.0 feasibility study recognises that as the economy decarbonises, more intermittent generation (such as wind and solar) will enter the market as baseload coal generation continues to retire. This creates the need for new sources of dispatchable energy generation such as pumped-hydro as well as the need for large-scale storage.

Budget

Location

Country

Australia

Source

Source reliability

High

Source

Australian Renewable Energy Agency (ARENA)

URL

More Details

Record type

Project

Sector

Commercial, Energy Storage, Hydro, Power Generation (CCGT), Solar, Stadium, Tunnel, Wind, Water Supply and Storage, Government, Consumer Products, Raw Materials, Manufacturing (Industrial)

Article published date

2023-04-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project