Snowy 2.0 Feasibility Study
Sector: Commercial • Location: Australia
Source: Australian Renewable Energy Agency (ARENA)
The Snowy 2.0 feasibility study confirms that the Snowy 2.0 pumped hydro expansion project is both technically and financially feasible.Snowy 2.0 would deliver 2000 MW of additional dispatchable generation capacity and 350,000 MWh of storage. The construction would involve building an underground hydro-electric power station and 27 kilometres of tunnels connecting two existing reservoirs in the Sn
- Status
- Closed
- Sector
- Commercial, Energy Storage, Hydro, Power Generation (CCGT), Solar, Stadium, Tunnel, Wind, Water Supply and Storage, Government, Consumer Products, Raw Materials, Manufacturing (Industrial)
- Location
- Australia
- Updated
- 22 Jul 2026
- Source
- Australian Renewable Energy Agency (ARENA)
ConstructChat
Ask ConstructChat about Snowy 2.0 Feasibility Study
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Snowy 2.0 feasibility study confirms that the Snowy 2.0 pumped hydro expansion project is both technically and financially feasible.Snowy 2.0 would deliver 2000 MW of additional dispatchable generation capacity and 350,000 MWh of storage. The construction would involve building an underground hydro-electric power station and 27 kilometres of tunnels connecting two existing reservoirs in the Snowy Mountains.Snowy Hydro already plays a critical role in ensuring system stability and at times of peak demand, the ability to keep the lights on. The feasibility study shows how Snowy 2.0 will enhance this current capability and continue to provide increased stability and security to the energy market.Area of innovationThe Snowy 2.0 feasibility study recognises that as the economy decarbonises, more intermittent generation (such as wind and solar) will enter the market as baseload coal generation continues to retire. This creates the need for new sources of dispatchable energy generation such as pumped-hydro as well as the need for large-scale storage. |
Budget |
Location
Country | Australia |
Source
Source reliability | High |
Source | Australian Renewable Energy Agency (ARENA) |
URL |
More Details
Record type | Project |
Sector | Commercial, Energy Storage, Hydro, Power Generation (CCGT), Solar, Stadium, Tunnel, Wind, Water Supply and Storage, Government, Consumer Products, Raw Materials, Manufacturing (Industrial) |
Article published date | 2023-04-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
