Snowy 2.0 Project
Sector: Hydro • Location: NSW, Australia
Source: AFR
The Snowy 2.0 project is a major pumped-hydro renewable energy initiative in New South Wales, involving the construction of 27 kilometers of tunnels and a new underground power station linking two existing reservoirs. The project has faced significant delays and cost overruns, recently exacerbated by a safety incident involving an exploding ventilation fan.
- Status
- Under Construction
- Sector
- Hydro, Power Generation (CCGT)
- Location
- NSW, Australia
- Updated
- 22 Jul 2026
- Source
- AFR
ConstructChat
Ask ConstructChat about Snowy 2.0 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Snowy 2.0 project is a major pumped-hydro renewable energy initiative in New South Wales, involving the construction of 27 kilometers of tunnels and a new underground power station linking two existing reservoirs. The project has faced significant delays and cost overruns, recently exacerbated by a safety incident involving an exploding ventilation fan. |
Original sector | Energy |
Budget |
Location
Country | Australia |
State | NSW |
Source
Source | AFR |
URL |
More Details
Record type | Project |
Sector | Hydro, Power Generation (CCGT) |
Article published date | 2025-03-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project