logo

Snowy 2.0 Pumped Hydro Electricity Generation Project

Sector: Hydro • Location: New South Wales, Australia

Source: The Nightly

Project
Delayed

Snowy 2.0 is an electricity-generating system based on pumping water between two dams in NSW’s Kosciuszko National Park. It involves linking existing dams at different elevations to produce a circular pumped hydro system.

Status
Failure
Sector
Hydro, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Government
Location
New South Wales, Australia
Updated
22 Jul 2026
Source
The Nightly

ConstructChat

Ask ConstructChat about Snowy 2.0 Pumped Hydro Electricity Generation Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Snowy 2.0 Pumped Hydro Electricity Generation Project” is an infrastructure initiative in the Hydro sector, located in New South Wales, Australia. Taiyo aggregates data on it from The Nightly.

Participants

Sponsoring Agency

Status

Original status

delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Snowy 2.0 is an electricity-generating system based on pumping water between two dams in NSW’s Kosciuszko National Park. It involves linking existing dams at different elevations to produce a circular pumped hydro system.

Original sector

Energy

Budget

Location

Country

Australia

State

New South Wales

Source

Source

The Nightly

URL

More Details

Record type

Project

Sector

Hydro, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Government

Article published date

2025-11-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project