Snowy 2.0 Pumped Hydro Project
Sector: Hydro • Location: New South Wales, Australia
Source: Renew Economy
Snowy 2.0 is a large-scale pumped hydro project connecting an upper reservoir to a lower reservoir through around 27 km of tunnels, with two massive caverns about a kilometre underground that will hold a power station the size of the Sydney Opera House. The project aims to provide a strategic national asset designed to operate for 150 years and ensure reliability in the future energy mix.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Snowy 2.0 is a large-scale pumped hydro project connecting an upper reservoir to a lower reservoir through around 27 km of tunnels, with two massive caverns about a kilometre underground that will hold a power station the size of the Sydney Opera House. The project aims to provide a strategic national asset designed to operate for 150 years and ensure reliability in the future energy mix. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
