Snowy 2.0 Transition Tunnel Lining Concrete Pour
Sector: Tunnel • Location: Australia
Source: Clough
The Snowy 2.0 project reached a milestone with the successful first tunnel lining concrete pour at the Tantagara site. The first 10 metres of the 50 metre transition tunnel, which links the water intake diffuser, gate shaft, and the 17 kilometre headrace tunnel, was completed.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under construction |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The Snowy 2.0 project reached a milestone with the successful first tunnel lining concrete pour at the Tantagara site. The first 10 metres of the 50 metre transition tunnel, which links the water intake diffuser, gate shaft, and the 17 kilometre headrace tunnel, was completed. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
