São Paulo Metro Lines 5 and 17 Concession PPP Project
Sector: Water Supply and Storage • Location: Sao Paulo, Brazil
Source: InfraPPPWorld
The project involves carrying out engineering studies, updating the existing basic design, and preparing the detailed executive design for the expansion of São Paulo Metro Line 17-Gold (Monorail). The proposed extension will add four new stations—Panamby, Paraisópolis, Américo Maurano, and Vila Paulista—enhancing connectivity between southern São Paulo neighborhoods, the existing metro network, an
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | project in tender |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project involves carrying out engineering studies, updating the existing basic design, and preparing the detailed executive design for the expansion of São Paulo Metro Line 17-Gold (Monorail). The proposed extension will add four new stations—Panamby, Paraisópolis, Américo Maurano, and Vila Paulista—enhancing connectivity between southern São Paulo neighborhoods, the existing metro network, and Congonhas Airport. The scope includes technical, operational, environmental, and structural assessments required to support future construction and to enable the subsequent procurement and implementation phases of the metro extension.The concession involves the operation and maintenance of:The 5-Lilac line will have 17 stations over 20.1 km, connecting Capão Redondo to Chácara Klabin, with two parking lots and train maintenance facilities. The estimated demand for the full line is 850,000 passengers per day. The extension of Line 5 involves the design and construction of 11 km of twin TBM-EPB tunnels, 10 new stations, 13 shafts, a terminal train depot and the delivery of 26 new trains. The new line will connect the Largo Treze Station to the Chácara Klabin Station in Vila Mariana, ultimately merging with Line 1 – Blue at the Santa Cruz Station, Line 2 – Green at the Chácara Klabin Station, and Line 17 – Gold at the Campo Belo Station.The 17-Gold line, which will link the Congonhas airport to the subway network of the city of São Paulo. The 7.7 km stretch will comprise eight elevated stations (Congonhas, Jardim Aeroporto, Brooklin Paulista, José Diniz Councilor, Campo Belo, Vila Cordeiro, Chucri Zaidan and Morumbi) and a parking and maintenance yard called Espraiada Water. The scheduled daily demand is 200,000 passengers. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
