São Tomé – Nexus Water–Energy–Resilience and Agriculture (NEW-ERA) Project – Preparation Phase
Sector: Raw Materials • Location: Sao Tome and Principe
Source: African Development Bank (AfDB)
This Project Preparation Facility (PPF) aims to prepare the required studies for the investments to be made in the context of the NEW-ERA project. It will also serve to strengthen the capacities of all related sector stakeholders, and provide knowledge products necessary for the harmonious, integrated and inclusive development of the sector as well as the effective development and management of wa
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | Obfuscated Data |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This Project Preparation Facility (PPF) aims to prepare the required studies for the investments to be made in the context of the NEW-ERA project. It will also serve to strengthen the capacities of all related sector stakeholders, and provide knowledge products necessary for the harmonious, integrated and inclusive development of the sector as well as the effective development and management of water resources in Sao Tome and Principe for the sake of optimizing the contribution to the water, energy and agriculture sectors development. Specifically, it will contribute to: (i) creating the conditions for achieving a level of access to water of 100%, (ii) sustainably increased the installed power generation capacity and enhance access to electricity, (iii) improve food production capacity in the project area by 2030 through the development of adequate infrastructure, resilient to the effects of climate change and strengthening the quality and efficiency of the water and power services; (iv) Establishing the foundations for adequate and responsible governance of water resources, taking into account competitive uses (energy, agriculture etc.) around the resource at the basin level (v) ensuring full resilience of ecosystems and populations in the project area to the effects of climate change. It will be implemented around 3 components: (I) Capacity Development, Water resources management and development for sustainable and inclusive socio-economic growth; (II) Nexus Water-Energy-Food Security investment preparation; (III) Project Coordination and Management. The project is scheduled to be implemented over a period of 24 months. Its total cost is estimated at UA 2,000,000.00, including UA 1million from the Bank, UA500,000 from the Africa Water Facility, UA 293,816 from the GCA (14.69%) and UA 206,184 (10.31%) from the Government of Sao Tome and Principe. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
