Sobrante Water Treatment Plant Reliability Improvements

Sector: Advanced Electronics • Location: El Sobrante, California, United States of America

Source: East Bay Municipal Utility District

Project
Planned

VIRTUAL COMMUNITY MEETING: • EBMUD held a virtual community meeting on April 27, 2023 at 6 p.m. via Zoom to discuss the project changes based on community input from Community Meeting #1 and 2. That meeting can be viewed here: East Bay Municipal Utility District (EBMUD) is in the planning phase of the Sobrante Water Treatment Plant (SOWTP) Reliabil

Project Information FAQ

Project Information

4 Q
The project “Sobrante Water Treatment Plant Reliability Improvements” is an infrastructure initiative in the Advanced Electronics sector, located in El Sobrante, California, United States of America. Taiyo aggregates data on it from East Bay Municipal Utility District.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

planned

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

VIRTUAL COMMUNITY MEETING: • EBMUD held a virtual community meeting on April 27, 2023 at 6 p.m. via Zoom to discuss the project changes based on community input from Community Meeting #1 and 2. That meeting can be viewed here: https://www.youtube.com/watch?v=O2M-3pvGn1g East Bay Municipal Utility District (EBMUD) is in the planning phase of the Sobrante Water Treatment Plant (SOWTP) Reliability Improvements Project (Project) which is located at the existing SOWTP at 5500 Amend Road in El Sobrante and the City of Richmond and in public roads in the Cities of Richmond and San Pablo and unincorporated communities of El Sobrante and Rollingwood. EBMUD is proposing the Project to increase the SOWTP treatment capacity to meet future water demands, treat supplemental water supplies during drought years, reduce disinfection byproducts, and improve the water treatment processes. The Project includes the installation of new facilities that have been divided into a Phase 1 and Phase 2. Phase 1 improvements will increase near-term water treatment capacity to 60 million gallons per day (MGD) while Phase 2 improvements will increase long-term water treatment capacity to 80 MGD. Phase 1 includes replacement of solids handling and water reclaim structures and installation of a new chlorine contact basin for water disinfection at the existing SOWTP site in El Sobrante and City of Richmond. The existing aging solids handling, and water reclaim structures, which are located adjacent to the Maloney Pumping Plant on La Honda Rd and D Avila Way in El Sobrante, will be demolished after the completion of Phase 1. Phase 1 is current scheduled for construction from Summer of 2030 to Summer of 2035. Phase 2 includes installation of additional solids removal and filtration treatment structures at the existing SOWTP site and installation of large-diameter pipelines, known as the Central North Aqueduct, from SOWTP along La Honda Road, D Avila Way, San Pablo Dam Rd, El Portal Drive, Rollingwood Drive, Road 20, and San Pablo Avenue (see image above). Phase 2 construction will not occur until water demands are realized. EBMUD is preparing an Environmental Impact Report (EIR) for the Project. A Notice of Preparation (NOP) of an EIR and Initial Study was completed in March 2022 and is available at the link below (see "Published studies and other resources" section of this page). Workplan and Schedule: The overall workplan and schedule is as follows: • Notice of Preparation (NOP) of EIR Publication - March 11, 2022 • Virtual NOP Scoping & Community Meeting #1 via Zoom - March 24, 2022 at 6 p.m. • Virtual Community Meeting #2 via Zoom with the 94803 Emergency Preparedness Alliance – October 6, 2022 at 6 p.m. • Virtual Community Meeting #3 via Zoom – April 27, 2023 at 6 p.m. • Draft EIR Publication – Summer 2024 • Public Meeting to Review Draft EIR – Summer 2024 • Final EIR Publication – Summer 2025 • EBMUD Board Consideration of Final EIR – Summer to Fall 2025 • Construction of Phase 1 – anticipated to occur from 2030 to 2035 • Construction of Phase 2 – anticipated to occur after 2045 when water demands are realized Contact Community Affairs Email: sowtp.improvements@ebmud.com Phone: 510-287-2053 Emergencies or after hours, call EBMUD 866-403-2683 Published studies and other resources: Public Meetings: • Public Meeting No. 1, March 24, 2022: EBMUD held a virtual community meeting where staff presented the Project, conceptual site design, visual simulations, and solicited input on potential community ideas, issues, and concerns. Presentation recording: https://youtu.be/Yj_AknlrTq4 • Public Meeting No. 2, October 6, 2022: EBMUD attended the 94803 Emergency Preparedness Alliance meeting where staff presented the Project, conceptual site design, visual simulations, and solicited input on potential community ideas, issues, and concerns. • Public Meeting No. 3, April 27, 2023: EBMUD held a virtual community meeting where staff presented the Project and shared revised conceptual site design, visual simulations based on community concerns from Public Meeting No. 1 and 2. Presentation recording: https://www.youtube.com/watch?v=O2M-3pvGn1g • City of Richmond Council Meeting, June 27, 2023: EBMUD provided a Project briefing at the City of Richmond Council meeting where staff presented the Project, revised conceptual site design, and visual simulations. • El Sobrante Municipal Advisory Committee (MAC) Meeting, August 9, 2023: EBMUD provided a Project briefing at the El Sobrante MAC meeting where staff presented the Project, revised conceptual site design, and visual simulations.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data