logo

Social Protection Project

Sector: Government • Location: Kosovo

Source: World Bank Group

Project
Closed

The project objectives of the Social Protection Project are to: 1) design a basic safety net for the immediate future; 2) design a sustainable social welfare system for the medium term; and 3) develop administrative capacity for delivery pf pensions, and veterans' (including disabled war veterans) benefits. There are four main components. The first component develops the social welfare structure b

Project Information FAQ

Project Information

5 Q
The project “Social Protection Project” is an infrastructure initiative in the Government sector, located in Kosovo. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project objectives of the Social Protection Project are to: 1) design a basic safety net for the immediate future; 2) design a sustainable social welfare system for the medium term; and 3) develop administrative capacity for delivery pf pensions, and veterans' (including disabled war veterans) benefits. There are four main components. The first component develops the social welfare structure by defining objectives and responsibilities of and interaction between public and private entities concerned with planning, management, administration, and delivery of social welfare services; drafting related regulatory acts, instructions, and guidelines; developing standards for accreditation and professional qualification; drafting job descriptions and determining skills requirements, staffing, and training needs. This component also strengthens policy analysis and administrative skills of the UN Interim Administration (UNMIK) Department of Health and Social Welfare (DHSW) staff; introduces strategic planning and policy development capacity; and develops an information and communications strategy aimed at welfare system workers and the general public. The second component upgrades the social welfare infrastructure. The third component builds the capacity of the Centers for Social Welfare (CSW). The fourth component strengthens essential servicesin the pension, veterans', and disabled war veterans' benefit administration.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data