logo
ProjectClosed

Social Protection Project

Sector: Government • Location: Kosovo

Source: World Bank Group

The project objectives of the Social Protection Project are to: 1) design a basic safety net for the immediate future; 2) design a sustainable social welfare system for the medium term; and 3) develop administrative capacity for delivery pf pensions, and veterans' (including disabled war veterans) benefits. There are four main components. The first component develops the social welfare structure b

Status
Closed
Sector
Government
Location
Kosovo
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Social Protection Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Social Protection Project” is an infrastructure initiative in the Government sector, located in Kosovo. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project objectives of the Social Protection Project are to: 1) design a basic safety net for the immediate future; 2) design a sustainable social welfare system for the medium term; and 3) develop administrative capacity for delivery pf pensions, and veterans' (including disabled war veterans) benefits. There are four main components. The first component develops the social welfare structure by defining objectives and responsibilities of and interaction between public and private entities concerned with planning, management, administration, and delivery of social welfare services; drafting related regulatory acts, instructions, and guidelines; developing standards for accreditation and professional qualification; drafting job descriptions and determining skills requirements, staffing, and training needs. This component also strengthens policy analysis and administrative skills of the UN Interim Administration (UNMIK) Department of Health and Social Welfare (DHSW) staff; introduces strategic planning and policy development capacity; and develops an information and communications strategy aimed at welfare system workers and the general public. The second component upgrades the social welfare infrastructure. The third component builds the capacity of the Centers for Social Welfare (CSW). The fourth component strengthens essential servicesin the pension, veterans', and disabled war veterans' benefit administration.

Original sector

FY17 - Public Administration,FY17 - Social Protection

Budget

Location

Country

Kosovo

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project