SAELPA is the electricity concessionaire of the state of Paraiba with generation, transmission and distribution functions. The company provides electricity to 715,000 customers in 217 municipalities. SAELPA has 47 substations, 1,192-KM of transmission lines and a 4,315-KM distribution network. In Nov. 2000, Cataguases, through its subsidiary Energipe, acquired 87.63% of SAELPA's shares for US$ 185

Status
Prospective
Sector
Government, Power Generation (CCGT), Power Transmission, Hydro, Commercial
Location
Paraiba, Brazil
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Sociedade Anonima de Eletrificacao da Paraiba (SAELPA)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Sociedade Anonima de Eletrificacao da Paraiba (SAELPA)” is an infrastructure initiative in the Government sector, located in Paraiba, Brazil. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

SAELPA is the electricity concessionaire of the state of Paraiba with generation, transmission and distribution functions. The company provides electricity to 715,000 customers in 217 municipalities. SAELPA has 47 substations, 1,192-KM of transmission lines and a 4,315-KM distribution network. In Nov. 2000, Cataguases, through its subsidiary Energipe, acquired 87.63% of SAELPA's shares for US$ 185.6 million. The remaining shares are held by the state-owned Eletrobras (13%), by the municipalities (2%) and other shareholders (3%). In Jan. 2001, Alliant Energy acquired 49.9% of the shares of PBPART-SE 1, the holding that was previously fully-owned by Energipe and which controls SAELPA (Alliant Energy paid Energipe US$ 110 million for this equity participation). In April 2006, Alliant Energy sold its stake in the company to Cataguazes-Leopoldina. In 2008, Companhia Forca e Luz Cataguases-Leopoldina was renamed Grupo Energisa because of the regulatory decision that a single company cannot operate in different segments of the energy market. Grupo Energisa's ownership structure is the following: Gipar S.A. (65.8%), Gaster Participações S/A (22.3%), Eletrobras (1.2%), Itacatu S.A. (5.9%), BNDES (0.7%) and other small shareholders (4.1%). The project company's name was also changed to Energisa Paraiba - Distribuidora de Energia S/A. As of December 2009, the project company was wholly-owned subsidiary of Grupo Energisa. In 2000, after investing US$ 6.4 million (R$ 12.5 million) in its facilities the company reach the mark of 719,708 consumers units. The total electricity consumption in 2000 was 2,074,000 MWh. In 2001 the company invested US$ 20 million (R$ 44.7 million) in its facilities and had its consumers units increased to 772,985. However, as a consequence of the electricity rationing program carried out by the government, the total electricity consumption decreased to 1,952,000 MWh. The electricity rationing program was implemented by the government as a response to the electricity supply crises occurred in 2001. In 2002, with the end of the ration program in February, the total electricity consumption increased to 2,061,000 MWh, but it was still lower than the 2000 level. By the end the end of 2002 SELPA was supplying 792,328 consumers units. During that year the company invested US$ 15.5 million (R$ 45.4 million). "Luz Para Todos" a government sponsored program, has been excluded from investment figures in 2007.

Original sector

Energy

Budget

Location

Country

Brazil

State

Paraiba

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Government, Power Generation (CCGT), Power Transmission, Hydro, Commercial

Article published date

2024-05-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project