Societe Nationale de Distribution d'Eau (SNDE) Second Management
Sector: Water Supply and Storage • Location: Drava, Congo, Rep.
Source: World Bank Group
In May 2013, it became known that the government of Congo (Republic of) and the Societe Nationale de Distribution d'Eau (SNDE) had signed an agreement in Brazzaville with Veolia, to improve the supply and the quality of potable water in Pointe-Noire and Brazzaville, the two biggest cities in the country.
The project included a rehabilitation of 212km of pipes in the distribution network, as well
- Status
- Prospective
- Sector
- Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Drava, Congo
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Societe Nationale de Distribution d'Eau (SNDE) Second Management
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | In May 2013, it became known that the government of Congo (Republic of) and the Societe Nationale de Distribution d'Eau (SNDE) had signed an agreement in Brazzaville with Veolia, to improve the supply and the quality of potable water in Pointe-Noire and Brazzaville, the two biggest cities in the country. The project included a rehabilitation of 212km of pipes in the distribution network, as well as 53000 private branches with meters and 175 public fountains. There was no information publicy available on the award method, or any of the other details usually described in the below. The turnaround for the contract was 4 years; the value of the contract was FCFA 6,833,632,021. The deal was part of the PEEDU program (Projet Eau, Electricité et Développement Urbain), co-financed by the World Bank (IDA, 20 percent) and the government of Congo (80 percent), for a total cost of $125.5 million. The deal was to serve 1,050,000 inhabitants of the two cities. |
Original sector | Water and sewerage |
Location
Country | Congo |
State | Drava |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Power Transmission, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-05-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
