SOF Creech Disaster Resiliency SOURCES SOUGHT REBID
One of 10,000+ projects Taiyo tracks in Nevada.
Source: Dodge USA
Design and construct a 50,364sf Squadron Operations Facility, a 41,053sf Aircraft Operations Facility, and 280,000sf of airfield pavements utilizing conventional design and construction methods to accommodate the Disaster Resiliency Program (DRP) mission sets. The single-story Squadron Operations Facility will be constructed with a reinforced concrete foundation, structural steel frame, masonry ex
- Status
- Closed
- Sector
- Metal, Aerospace & Defense, Cement, Power Transmission, Road, Steel, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Nellis Air Force Base, Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about SOF Creech Disaster Resiliency SOURCES SOUGHT REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Design and construct a 50,364sf Squadron Operations Facility, a 41,053sf Aircraft Operations Facility, and 280,000sf of airfield pavements utilizing conventional design and construction methods to accommodate the Disaster Resiliency Program (DRP) mission sets. The single-story Squadron Operations Facility will be constructed with a reinforced concrete foundation, structural steel frame, masonry exterior walls, and standing seam metal roof system. The AOF is comprised of four flow-thru style a... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Nevada |
City | Nellis Air Force Base |
Source
Source reliability | Medium |
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Metal, Aerospace & Defense, Cement, Power Transmission, Road, Steel, Government, Commercial, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-01-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United States of America
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Annenberg Science Complex - James M. Rosser Hall [027B-ASCR]
- ADD NEW PRE-FAB STEEL GARAGE 780SQ FT SHARES PLANS WITH 202104289 & 202104326
- NEW 3200 SF PREFAB METAL BUILDING CONSISTING OF A CUSTOMER INTERFACE, OFFICES, RESTROOM/BREAK ROOM, DISASSEMBLY & STOR.
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- REPLACE DAMAGED STEEL COLUMN
