logo
ProjectSigned

SOFICO – Wallonia Locks (TEN-T)

One of 5,497 projects Taiyo tracks in Belgium.

Source: European Investment Bank (EIB)

The project consists of the construction of two new 225 m x 25 m locks (international standard class VIb) and ancillary works at Lanaye (Lanaye Canal) and Ivoz-Ramet (mid-Meuse) and the dredging of the Ivoz-Ramet reach.

Status
Under Construction
Sector
Water Supply and Storage, Government
Location
Belgium
Updated
22 Jul 2026
Source
European Investment Bank (EIB)

ConstructChat

Ask ConstructChat about SOFICO – Wallonia Locks (TEN-T)

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “SOFICO – Wallonia Locks (TEN-T)” is an infrastructure initiative in the Water Supply and Storage sector, located in Belgium. Taiyo aggregates data on it from European Investment Bank (EIB).

Participants

Sponsoring Agency

Status

Original status

signed

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

<p>The project consists of the construction of two new 225 m x 25 m locks (international standard class VIb) and ancillary works at Lanaye (Lanaye Canal) and Ivoz-Ramet (mid-Meuse) and the dredging of the Ivoz-Ramet reach.</p>

Original sector

Transport

Location

Country

Belgium

Source

Source

European Investment Bank (EIB)

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government

Article published date

2025-07-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project