Sohar Aluminium Smelter, Oman

Sector: Cable car • Location: Oman

Source: Bechtel

Project
Close

Sohar Aluminium Smelter,Making aluminum history in Oman Sohar Aluminium was formed for a specific reason: to execute a major greenfield smelter project in Oman. The company, jointly owned by OQ Group, Abu Dhabi National Energy Company PJSC - TAQA and Rio Tinto, planned to build the Persian Gulf’s first smelter in 25 years, which would include the world’s longest and highest-capacity potline. To

Project Information FAQ

Project Information

5 Q
The project “Sohar Aluminium Smelter, Oman” is an infrastructure initiative in the Cable car sector, located in Oman. Taiyo aggregates data on it from Bechtel.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Sohar Aluminium Smelter,Making aluminum history in Oman Sohar Aluminium was formed for a specific reason: to execute a major greenfield smelter project in Oman. The company, jointly owned by OQ Group, Abu Dhabi National Energy Company PJSC - TAQA and Rio Tinto, planned to build the Persian Gulf’s first smelter in 25 years, which would include the world’s longest and highest-capacity potline. To help make this project a reality, Sohar partnered with Bechtel. The assignment followed our successful expansion of Alba’s smelter in Bahrain. The experience we gained at Alba and previous projects was crucial given the size and complexity Sohar required. Sohar was created to ensure efficiency, environmental protection and the safety of its workforce. In addition to the line with 360 pots, which allow the smelter to reach annual production capacity of 375,000 metric tons, the project also included construction of a carbon plant, an ingot-casting facility, and a port facility for storage and shipping. Simultaneously with Sohar, Bechtel executed the other greenfield smelter being built at the time - Fjarðaál in Iceland. Thanks to the strong collaboration between Bechtel and our customers, both became benchmark examples of how to execute metals megaprojects. Image gallery Vision 2020: contributing to economic diversification Unlike other countries in the Gulf region, Oman is not a major oil producer. As a result, the government encourages foreign investment in industries such as aluminum. Throughout project execution, Bechtel and its customer helped Oman make progress on its Vision 2020 plan, geared towards creating opportunities for local workers. In addition to training and hiring Omani workers, the project awarded more than $300 million to local companies for smelter-related goods and services that ranged from providing concrete and steel to supplying on-site camp food and furnishings. Upskilling success In a first for the country, women were trained in electrical and mechanical disciplines and placed into construction roles. With support from Oman’s Ministry of Manpower and our customer, construction trainees spent four to six months learning carpentry, masonry, machinery operation, and electrical skills. The courses included classroom and on-the-job training sessions tailored to local craft skills. We also worked with Sohar to offer courses on environmental, safety, and health practices, financial literacy and English. Workforce highlights 1,900 Omanis were employed at the peak of construction 868 Omanis were trained and hired as electricians, carpenters, and other skilled positions 30 percent of all mechanical assistants on the project were Bechtel-trained and hired Omani women At the time First Hot Metal was produced, which occurred less than three years after the project was awarded to Bechtel, the team had worked nearly 12 million consecutive job hours without an accident. Saving a precious resource Curing concrete in 580 support columns for the pot room structure would have been an enormous challenge anywhere, but especially in Oman, where temperatures reach 122 degrees Fahrenheit (50 degrees Celsius) and water is available only by trucking it in. We worked closely with our customer and contractors to develop an innovative solution to avoid spraying the concrete surface with scarce water that would have rapidly evaporated. We bonded panels of polystyrene foam to timber framing then bolted them together around the columns. The system did not require maintenance or water, and the panels were reused, saving time and resources. Sohar, which was completed on schedule and within its budget, produced over 3.7 million metric tons of aluminum in its first 10 years of operation. The cutting-edge technology used in the production process maximizes productivity and plant performance, thus increasing production volumes.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Medium

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data