Soil and Water Improvement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Road reconstruction will do done on FR 2192 for 0.8 miles. This will include road reconditioning (ditch lines, outlets, blading, and roadbed); mowing and limbing roadway; spreading backfill material over several sections of roadbed; replacing/installing 144 feet of 18 diameter culverts; and spreading 2 base crushed aggregate onto 0.8 miles of road.
- Status
- Closed
- Sector
- Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Oil and Gas
- Location
- Rolla, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Soil and Water Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Road reconstruction will do done on FR 2192 for 0.8 miles. This will include road reconditioning (ditch lines, outlets, blading, and roadbed); mowing and limbing roadway; spreading backfill material over several sections of roadbed; replacing/installing 144 feet of 18 diameter culverts; and spreading 2 base crushed aggregate onto 0.8 miles of road. |
Procurement method |
Location
Country | United States of America (USA) |
State | Missouri |
City | Rolla |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Commercial, Water Supply and Storage, Road, Waste Processing and Treatment, Oil and Gas |
Article published date | 2024-03-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project