Sokal HPP Construction
Sector: Wind • Location: Lviv, Ukraine
Source: ЭкоПолитика
The construction of the Sokal small hydroelectric power plant has begun on the Western Bug River in Lviv region. The project aims to generate an average of 6.5 million kWh per year using a vertical Kaplan turbine with a maximum power output of 1078 kW.
- Status
- Under Construction
- Sector
- Wind, Power Generation (CCGT)
- Location
- Lviv, Ukraine
- Updated
- 22 Jul 2026
- Source
- ЭкоПолитика
ConstructChat
Ask ConstructChat about Sokal HPP Construction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The construction of the Sokal small hydroelectric power plant has begun on the Western Bug River in Lviv region. The project aims to generate an average of 6.5 million kWh per year using a vertical Kaplan turbine with a maximum power output of 1078 kW. |
Original sector | Energy |
Location
Country | Ukraine |
State | Lviv |
Source
Source | ЭкоПолитика |
URL |
More Details
Record type | Project |
Sector | Wind, Power Generation (CCGT) |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
