Sokodé–Bassar Road Rehabilitation

Under construction · Togo · Last reported May 2026

Source: EthiopiaToday

Project
Under Construction

Rehabilitation of the vital 62-kilometer Sokodé–Bassar Road corridor in Togo, featuring extensive road upgrades, advanced rainwater and flood protection systems, and comprehensive engineering supervision. The project aims to improve transport safety, lower transit costs, and strengthen trade connectivity between Lomé, inland regions, and neighboring countries.

Status
Under Construction
Sector
Road
Location
Togo
Updated
22 Jul 2026
Source
EthiopiaToday

ConstructChat

Ask ConstructChat about Sokodé–Bassar Road Rehabilitation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Sokodé–Bassar Road Rehabilitation” is an infrastructure initiative in the Road sector, located in Togo. Taiyo aggregates data on it from EthiopiaToday.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Rehabilitation of the vital 62-kilometer Sokodé–Bassar Road corridor in Togo, featuring extensive road upgrades, advanced rainwater and flood protection systems, and comprehensive engineering supervision. The project aims to improve transport safety, lower transit costs, and strengthen trade connectivity between Lomé, inland regions, and neighboring countries.

Original sector

Transport

Budget

Location

Country

Togo

Source

Source

EthiopiaToday

URL

More Details

Record type

Project

Sector

Road

Article published date

2026-05-30

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project