logo
ProjectOpenBP

SOL 10 Neillian CR

Sector: Solar • Location: Jamaica Plain, Massachusetts, United States of America

Source: City of Boston

Install two solar thermal flat plate collectors, storage tank, pump station and insulated pipe for a solar thermal domestic hot water system. Collectors will be located on the rear roof. Six attachement brackets(3 above and 3 below) will be used for each collector. Attachment brackets will be attached to existing "sistered" 2x6 rafters(12' long) using 3/8" stainless steel 3 1/2" long lag screws

Status
Prospective
Sector
Solar, Water Supply and Storage, Steel, Geothermal, Commercial, Government, Metal
Location
Jamaica Plain, Massachusetts, United States of America
Updated
19 Nov 2026
Source
City of Boston

ConstructChat

Ask ConstructChat about SOL 10 Neillian CR

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “SOL 10 Neillian CR” is an infrastructure initiative in the Solar sector, located in Jamaica Plain, Massachusetts, United States of America. Taiyo aggregates data on it from City of Boston.

Participants

Sponsoring Agency

Status

Original status

open

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Install two solar thermal flat plate collectors, storage tank, pump station and insulated pipe for a solar thermal domestic hot water system. Collectors will be located on the rear roof. Six attachement brackets(3 above and 3 below) will be used for each collector. Attachment brackets will be attached to existing "sistered" 2x6 rafters(12' long) using 3/8" stainless steel 3 1/2" long lag screws with stainless steel washers. All roof penetrations will be flashed and sealed with SkiFlex 1A construction sealant.

Budget

Location

Country

United States of America (USA)

State

Massachusetts

City

Jamaica Plain

Source

Source

City of Boston

URL

More Details

Record type

Project

Sector

Solar, Water Supply and Storage, Steel, Geothermal, Commercial, Government, Metal

Article published date

2025-08-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project