SOL 134 Kittredge ST
Open · Massachusetts
Source: City of Boston
Installation of 14 Canadian Solar CS6P-230P solar modules. Modules will be mounted using stainless steel, EcoFasten mounting hardware. Each module is attached to two rails that are attached to the roof every 4’ depending on rafter spacing. Mounting feet will be attached rafters using 5/16" lag bolts that will penetrate 3" into the existing rafters. The mounting system will be designed to withst
- Status
- Prospective
- Sector
- Solar, Steel, Commercial, Government, Metal
- Location
- Roslindale, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SOL 134 Kittredge ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Installation of 14 Canadian Solar CS6P-230P solar modules. Modules will be mounted using stainless steel, EcoFasten mounting hardware. Each module is attached to two rails that are attached to the roof every 4’ depending on rafter spacing. Mounting feet will be attached rafters using 5/16" lag bolts that will penetrate 3" into the existing rafters. The mounting system will be designed to withstand code mandated 90 mph winds and snow loads of 30 lbs psf. The existing roof conditions consist of a 10/12 pitch with true 2" x 6 1/4" rafters that are 18" on center with an 11' span. There is also a structural knee wall as well as collar ties every other rafter. |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Roslindale |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Solar, Steel, Commercial, Government, Metal |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- I-85 @ SR 1/US 27 - SOLAR PANEL FARM - TRACKING ONLY
- INSTALL ROOF MOUNTED PV SYSTEM 10 MODULES 2.6 KW
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 8.69 KW 22 PANELS
- PV SOLAR ROOF MOUNT SYSTEM 4.80 KW WIHT 12 MODULES
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 16 UNIT 206 (7) MODULE 2.45 KW SYSTEM
- 8.19 KW ROOF MOUNT SOLAR INSTALL WITH (18) 455W MODULES AND (9) AP SYSTEM DS3-L MICROINVERTERS.
- INSTALL 4.4 KW PV ARRAY WITH (11) 400W MODULES.
- ROOF MOUNT SOLAR: (11) 400W MODULES AT 4.4 KW TOTAL
