SOL 34-36 Eatonia ST
The status, timeline and source of this project. A free account opens every field.
Source: City of Boston
the installation of (24) 240 watt Monosilicon Canadian Solar photovoltaic panels; CS6P-240M or equivalent, (1) SMA Sunny Boy 5000 US grid-tied solar electric inverter, Iron Ridge extruded aluminum solar mounting rail with hardware, (1) Flashed Metallic Junction Box, (1) Sunny Box Webbox for web-based data monitoring, all hardware, disconnects, cable, and labor to provide a code-compliant, NABCEP-c
- Status
- Prospective
- Sector
- Solar, Steel, Metal, Rail, Commercial, Government
- Location
- Allston, Massachusetts, United States of America
- Updated
- 19 Nov 2026
- Source
- City of Boston
ConstructChat
Ask ConstructChat about SOL 34-36 Eatonia ST
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | open |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | the installation of (24) 240 watt Monosilicon Canadian Solar photovoltaic panels; CS6P-240M or equivalent, (1) SMA Sunny Boy 5000 US grid-tied solar electric inverter, Iron Ridge extruded aluminum solar mounting rail with hardware, (1) Flashed Metallic Junction Box, (1) Sunny Box Webbox for web-based data monitoring, all hardware, disconnects, cable, and labor to provide a code-compliant, NABCEP-certified installation |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | Allston |
Source
Source | City of Boston |
URL |
More Details
Record type | Project |
Sector | Solar, Steel, Metal, Rail, Commercial, Government |
Article published date | 2025-08-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
