logo
ProjectPlanned

Sol Cautivo Solar Project

Planned · Puno · Last reported May 2025

Source: BNamericas

Omega Energías Renovables Perú plans to build the Sol Cautivo photovoltaic park in the district of Umachiri, Melgar province, Puno region. The project includes dispatching production to the national grid via a 5.3km line from the planned Sol Cautivo substation to the Tintaya-Ayaviri transmission line.

Status
Prospective
Sector
Power Generation (CCGT), Solar
Location
Umachiri, Puno, Peru
Updated
22 Jul 2026
Source
BNamericas

ConstructChat

Ask ConstructChat about Sol Cautivo Solar Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Sol Cautivo Solar Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Umachiri, Puno, Peru. Taiyo aggregates data on it from BNamericas.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Omega Energías Renovables Perú plans to build the Sol Cautivo photovoltaic park in the district of Umachiri, Melgar province, Puno region. The project includes dispatching production to the national grid via a 5.3km line from the planned Sol Cautivo substation to the Tintaya-Ayaviri transmission line.

Original sector

Electric Power

Location

Country

Peru

State

Puno

City

Umachiri

Source

Source

BNamericas

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Solar

Article published date

2025-05-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project