logo
Project

Solar & Wind for Water

The status, timeline and source of this project. A free account opens every field.

Source: African Development Bank (AfDB)

The utilization of Solar and Wind Energy for Rural Water Supply Pilot Project is designed because the use of solar and wind energy for water pumping is an attractive option in the rural areas and there are no projects currently under implementation which comprehensively addresses this aspect. Furthermore, 83% of the population in rural areas has no access to the electric grid to power mechanised p

Sector
Raw Materials, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Wind, Solar, Government
Location
Ethiopia
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Solar & Wind for Water

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Solar & Wind for Water” is an infrastructure initiative in the Raw Materials sector, located in Ethiopia. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The utilization of Solar and Wind Energy for Rural Water Supply Pilot Project is designed because the use of solar and wind energy for water pumping is an attractive option in the rural areas and there are no projects currently under implementation which comprehensively addresses this aspect. Furthermore, 83% of the population in rural areas has no access to the electric grid to power mechanised pumps. The goal or vision of the project is the widespread use of wind and solar technologies for rural water supply in Ethiopia. Its estimated cost is €2,165,680 of which €1,4529,220 (70.6%) is in foreign exchange and the remaining €636,460 is in local currency equivalent. Project activities will be undertaken in four components or phases: (i) Assessment and Preparation; (ii) Design and Implementation of Pilot Works - Stage I; (iii) Design and Implementation of Pilot Works - Stage II; and (iv) Development of Framework for Incorporation of Solar/Wind into the Universal Access Program for water supply and sanitation services (UAP).

Original sector

Water Supply & Sanitation

Budget

Location

Country

Ethiopia

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Raw Materials, Water Supply and Storage, Power Transmission, Power Generation (CCGT), Wind, Solar, Government

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project