logo
ProjectPre-Design

Solar Array 20MW & Battery Storage 80MW

Pre-design · Colorado · Last reported Jan 2025

Source: Dodge

20-megawat solar array and an 80-megawatt-hour battery storage, ensuring reliable energy for about 7,000 homes

Status
Prospective
Sector
Consumer Products, Solar, Commercial, Energy Storage, Power Generation (CCGT), Raw Materials, Residential
Location
Grand Junction, Colorado, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Solar Array 20MW & Battery Storage 80MW

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Solar Array 20MW & Battery Storage 80MW” is an infrastructure initiative in the Consumer Products sector, located in Grand Junction, Colorado, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

20-megawat solar array and an 80-megawatt-hour battery storage, ensuring reliable energy for about 7,000 homes

Budget

Location

Country

United States of America (USA)

State

Colorado

City

Grand Junction

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Consumer Products, Solar, Commercial, Energy Storage, Power Generation (CCGT), Raw Materials, Residential

Article published date

2025-01-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project