Solar Array
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
6.4 MW-DC ground mounted solar project on the west side of the Brunswick Executive Airport on Parcel # 40-90 in the Growth College 4 zoning district aka 14 Transmitter Drive
- Status
- Closed
- Sector
- Airport, Solar, Power Generation (CCGT), Road, Commercial
- Location
- Brunswick, Maine, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Solar Array
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Notice of Completion |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 6.4 MW-DC ground mounted solar project on the west side of the Brunswick Executive Airport on Parcel # 40-90 in the Growth College 4 zoning district aka 14 Transmitter Drive |
Budget |
Location
Country | United States of America (USA) |
State | Maine |
City | Brunswick |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Airport, Solar, Power Generation (CCGT), Road, Commercial |
Article published date | 2024-09-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
