logo

Solar-BESS Project at Kajra

Sector: Solar • Location: Kajra, Bihar, India

Source: Capital Market

Project
Awarded

Larsen & Toubro's Renewables vertical secured a significant order to develop a grid-connected 116 MWac photovoltaic plant integrated with a 241 MWh Battery Energy Storage System (BESS) at Kajra in Bihar. The project includes advanced liquid cooling technology for the BESS and aims to facilitate energy time-shifting to store and dispatch surplus clean energy during peak demand periods. This project

Status
Closed
Sector
Solar, Energy Storage, Government, Commercial, Residential
Location
Kajra, Bihar, India
Updated
22 Jul 2026
Source
Capital Market

ConstructChat

Ask ConstructChat about Solar-BESS Project at Kajra

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Solar-BESS Project at Kajra” is an infrastructure initiative in the Solar sector, located in Kajra, Bihar, India. Taiyo aggregates data on it from Capital Market.

Participants

Company

Status

Original status

awarded

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Larsen & Toubro's Renewables vertical secured a significant order to develop a grid-connected 116 MWac photovoltaic plant integrated with a 241 MWh Battery Energy Storage System (BESS) at Kajra in Bihar. The project includes advanced liquid cooling technology for the BESS and aims to facilitate energy time-shifting to store and dispatch surplus clean energy during peak demand periods. This project supports the Government of India's policy on co-located renewable energy storage and Bihar's Jal-Jeevan-Hariyali Abhiyan, contributing to employment and energy security.

Original sector

Energy

Budget

Location

Country

India

State

Bihar

City

Kajra

Source

Source

Capital Market

URL

More Details

Record type

Project

Sector

Solar, Energy Storage, Government, Commercial, Residential

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project