Solar energy and energy efficiency promotion program

Sector: Manufacturing (Industrial) • Location: Senegal

Source: KFW Bank aus Verantwortung

Project
Active

The FC measure envisaged the expansion of the FC-financed 15 MW photovoltaic (PV) plant Diass by around 8 MW. The expansion was to be directly connected to the existing plant both spatially and technically and be fully integrated into it, resulting in a single plant of around 23 MW. Senelec was responsible for implementing the project; the Project Implementation Unit (PIU) established for the orig

Project Information FAQ

Project Information

5 Q
The project “Solar energy and energy efficiency promotion program” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Senegal. Taiyo aggregates data on it from KFW Bank aus Verantwortung.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The FC measure envisaged the expansion of the FC-financed 15 MW photovoltaic (PV) plant Diass by around 8 MW. The expansion was to be directly connected to the existing plant both spatially and technically and be fully integrated into it, resulting in a single plant of around 23 MW. Senelec was responsible for implementing the project; the Project Implementation Unit (PIU) established for the original project took over the coordination of all project-related matters and was responsible for project implementation. The supplies and (construction) services to be provided were awarded as an EPC (Engineering, Procurement and Construction) contract to the provider identified for the original project as part of an open international tender. The provider was responsible as general contractor for the detailed technical planning, the procurement and manufacture of all necessary system components as well as for the assembly and turnkey commissioning of the systems. The one-year follow-up support phase provided for in the original project was extended to the follow-up project. The total cost of the extension was estimated at approximately EUR 7.7 million, of which EUR 7 million was provided by German FC funds and EUR 0.7 million by the Senegalese side. The accelerated FC project review and approval process was to be completed by the end of October 2017, with the financing contract signed before the end of 2017. If the supply and service contract was awarded to the successful bidder of the original project before the end of the fourth quarter, construction of the extension began in the first quarter of 2018 and work was completed approximately 4 - 6 months after construction began.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data